Your location:Home  Products   Ringlock Scaffolding System  Aluminium Ringlock Scaffolding System For Aerial Work
Aluminium Ringlock Scaffolding System For Aerial Work
Aluminium Ringlock Scaffolding towers System For Aerial Work

Aluminium Ringlock Scaffolding System For Aerial Work

Aluminium Ringlock Scaffolding towers System For Aerial Work:
● High Grade Aluminium takes heavy loading capacity, get to 4.4kN.
● Light Weight makes high work effective.
● Special design for aerial using, easy installation, less labour force, economic cost.
● More items for more possibilities.
● Aluminium ringlock scaffolding tower and more sizes can be customized.
● Sample Model below: 7m(H)X2.07m(L)X1.40m(W) with base support.
Product Detail

Aluminium Ringlock Scaffolding System product description


● High Grade Aluminium takes heavy loading capacity, get to 4.4kN.

● Light Weight makes high work effective.

● Special design for aerial using, easy installation, less labour force, economic cost.

● More items for more possibilities.

● Aluminium ringlock scaffolding tower and more sizes can be customized.

● Sample Model below: 7m(H)X2.07m(L)X1.40m(W) with base support.


aluminium scaffold towers Product parameters



related products


aluminium scaffold towers Product Details

aluminium scaffold towers Product Details


Aluminium Ringlock Scaffolding System For Aerial Work detailed images


Put adjustable base jack on the ground, followed by the base collars, with the thinner tube downwards onto the adjustable base jack. The recommended height for the adjustable base jack extension is 20 cm. Begin erecting at the ground’s highest point.

Put adjustable base jack on the ground, followed by the base collars, with the thinner tube downwards onto the adjustable base jack. The recommended height for the adjustable base jack extension is 20 cm. Begin erecting at the ground’s highest point.


In the first bay connect the single ledger (A)m and single ledgers (B)m to the small holes of the base collars. Check the assembled frame and ensure that it is level and square.Note: Anchor the base jack to the ground.

In the first bay connect the single ledger (A)m and single ledgers (B)m to the small holes of the base collars. Check the assembled frame and ensure that it is level and square.Note: Anchor the base jack to the ground.


Place the standards 2.0m over the adjustable base jack onto the base collars.

Place the standards 2.0m over the adjustable base jack onto the base collars.


Install the second floor single ledgers at a 2m height (4 rosette spacings). The specifications of Single ledgers follow the first floor bays.

Install the second floor single ledgers at a 2m height (4 rosette spacings). The specifications of Single ledgers follow the first floor bays.


Put the stairway to the section you want at the 2.0m height.

Put the stairway to the section you want at the 2.0m height.


Install the diagonal bracing according to plan.Meanwhile, secure all the wedges of single ledgers and diagonal braces with hammer.

Install the diagonal bracing according to plan.Meanwhile, secure all the wedges of single ledgers and diagonal braces with hammer.


Install the internal handrail on to stair way.

Install the internal handrail on to stair way.


Installing the plank beside the stairway. Lock the planks to the single ledgers with the lock plate at the back of planks.

Installing the plank beside the stairway. Lock the planks to the single ledgers with the lock plate at the back of planks.


Repeat the step 1-4 for upper section install.TIP: When putting the standards on top of each other, turn them so that they can, (if necessary), be connected to one another with locking pins.

Repeat the step 1-4 for upper section install.TIP: When putting the standards on top of each other, turn them so that they can, (if necessary), be connected to one another with locking pins.


Install the second stairway from the second floor to third foor. Repeat the step 5-6 to install the handrail and planks. Flow up with others parts as plan if have customize design.

Install the second stairway from the second floor to third foor. Repeat the step 5-6 to install the handrail and planks. Flow up with others parts as plan if have customize design.




aluminium scaffold towers packing and shipping


aluminium scaffold towers packing and shipping

Inquiry Now
Name: *
Mobile:
E-mail: *
Message: *
Verification code: *
  
Other products
Hot products
We're here to help
If you are looking for experienced and reliable supplier for construction industry, please contact us and tell us your requirements,
you will get professional recommendations and accurate quotation.
    bottom_logo

    Adhering to the enterprise principle of "quality is our lifeblood, customers' satisfaction is our concern", every production procedure is inspected strictly, from design to manufacture, from the purchase of auxiliary materials to finished products.

    • bottom_noraml_ico1
    • bottom_noraml_ico2
    • bottom_noraml_ico3
    • bottom_noraml_ico4

    Contact Us

    E-mail: yueyang@yueyangcz.com

    Tel: +86-519-86510728

    Fax: +86-519-86518567

    WhatsApp: +86-13511678815

    Add: Qianhuang Industrial Park, Wujin District, Changzhou City , Jiangsu Province. China . 213172

CopyRight © 2024 Changzhou Yueyang Machinery Co., Ltd. All rights reserved Sitemap  All tags